Registration is closed for this event
Sunday, October 14 from 7:00 a.m. – 12:00 p.m. Near Glenn and Tucson Blvd.

Be a part of WMG's largest residential Green Infrastructure installation ever with this Co-op workshop co-led by WMG instructors James DeRoussel and Tory Syracuse. This corner lot with a wide right-of-way presents the opportunity to double our impact by installing curb cuts and basins on both streets, and is right next to a major urban wash. This will demonstrate the potential benefits of green infrastructure in reducing flooding and the pollution load flowing into washes,  while putting stormwater to benefit by growing plants to shade and beautify the street.

James DeRoussel and Tory Syracuse will lead further educational discussions on the benefits of Green Infrastructure and the permit process working in the public right-of-way.

When
October 14th, 2012 from  7:00 am to 12:00 pm
Contact
Phone: (520)396.3266